21 March 2011
Navy Plans TRIDENT Explosives Wharf
[Federal Register: March 21, 2011 (Volume 76, Number 54)]
[Notices]
[Page 15302-15305]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21mr11-45]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Public Hearing for the Draft Environmental Impact
Statement for the TRIDENT Support Facilities Explosives Handling Wharf,
Naval Base Kitsap Bangor, Silverdale, Kitsap County, WA
AGENCY: Department of the Navy, DoD.
ACTION: Notice.
-----------------------------------------------------------------------
[[Page 15303]]
SUMMARY: Pursuant to section 102(2)(c) of the National Environmental
Policy Act (NEPA) and the Council on Environmental Quality Regulations
for implementing the procedural provisions of NEPA (Title 40 Code of
Federal Regulations Parts 1500-1508), the Department of the Navy (Navy)
has prepared and filed with the U.S. Environmental Protection Agency a
Draft Environmental Impact Statement (EIS) to evaluate the potential
environmental effects of constructing and operating a second Explosives
Handling Wharf (EHW-2) at Naval Base Kitsap Bangor (NBK Bangor),
Silverdale, WA. The U.S. Army Corps of Engineers (USACE) and the
National Marine Fisheries Service (NMFS) are cooperating agencies for
the EIS.
The Navy will conduct three public hearings to receive oral and
written comments on the Draft EIS. Federal, State, and local agencies,
elected officials, and other interested individuals and organizations
are invited to be present or represented at the public hearings. This
notice announces the dates and locations of the public hearings for
this Draft EIS.
Dates and Addresses: Public hearings will be held on the following
dates and locations:
1. April 19, 2011, at the North Kitsap High School Commons, 1780
Northeast Hostmark Street, Poulsbo, WA 98370;
2. April 20, 2011, at the Chimacum High School, 91 West Valley
Road, Chimacum, WA 98325; and
3. April 21, 2011, at the Seattle Central Library, 1000 Fourth
Avenue, Seattle, WA 98104.
All meetings will start with an open house session from 6 p.m. to
7:30 p.m. followed by a presentation and public comment period from
7:30 p.m. to 9 p.m. The open house sessions will allow individuals the
opportunity to review summaries of the information presented in the
Draft EIS. Navy representatives will be available during the open house
sessions to clarify information related to the Draft EIS.
FOR FURTHER INFORMATION CONTACT: Naval Facilities Engineering Command
Northwest, 1101 Tautog Circle, Silverdale, WA 98315-1101, Attn:
Christine Stevenson, EHW-2 EIS Project Manager; or http://
ehw.nbkeis.com.
SUPPLEMENTARY INFORMATION: A Notice of Intent to prepare this Draft EIS
was published in the Federal Register on May 15, 2009 (74 FR 22900).
Three public scoping meetings were held in Poulsbo, Port Ludlow, and
Seattle, WA. The first public scoping meeting was held on June 23,
2009, at the Poulsbo Fire Station Main Headquarters, 911 Northeast
Liberty Road, Poulsbo, WA. The second public scoping meeting was held
on June 24, 2009, at the Port Ludlow Fire Station 31, 7650 Oak Bay
Road, Port Ludlow, WA. The third public scoping meeting was held on
June 25, 2009, at the Starbucks Corporate Headquarters, 2401 Utah
Avenue South, 3rd Floor, Seattle, WA. The meeting was originally
scheduled to be held at the John Stanford Center for Educational
Excellence, 2445 3rd Avenue South, Seattle, WA but was relocated due to
unforeseen venue cancellation. Notifications were made to the media
immediately upon reserving the new venue and handouts with the new
location were distributed to those arriving at the John Stanford Center
for Educational Excellence.
The proposed action is to construct and operate an EHW-2 adjacent
to, but separate from, the existing Explosives Handling Wharf (EHW-1)
at the NBK Bangor waterfront. The proposed action consists of in-water
and land-based construction and operations. NBK Bangor, located on Hood
Canal approximately 20 miles west of Seattle, provides berthing and
support services for OHIO Class ballistic missile submarines, hereafter
referred to as TRIDENT submarines. As part of the Navy's sea-based
strategic deterrence mission, the Navy Strategic Systems Programs (SSP)
directs research, development, manufacturing, test, evaluation, and
operational support of the TRIDENT Fleet Ballistic Missile program. SSP
is the action proponent and the Navy is the lead agency for this
project.
The purpose for the proposed action is to support future TRIDENT
program requirements for TRIDENT submarines currently homeported at NBK
Bangor and the TRIDENT II (D5 missile) Strategic Weapons System. The
proposed action is needed to support TRIDENT program requirements of
400 operational days per year. The EHW-1 currently provides
approximately 200 operational days per year due to required facility
preventative maintenance and pile replacement. The Navy anticipates
that after pile replacement concludes in 2024, the EHW-1 will provide
approximately 300 operational days per year. The proposed EHW-2 would
provide 300 operational days per year. Therefore, EHW-1 and the
proposed EHW-2 would provide a total available capacity of
approximately 500-600 operational days per year. The proposed EHW-2
would be designed to meet all TRIDENT program requirements.
SSP evaluated a range of alternatives that would meet action
objectives, and applied screening criteria to identify those
alternatives that were ``reasonable'' (i.e., practical and feasible).
Screening criteria included: capability for meeting TRIDENT mission
requirements; ability to avoid or minimize environmental impacts;
siting requirements including proximity to existing infrastructure;
availability of waterfront property; constructability of essential
project features; and explosives safety restrictions. Reasonable
alternatives were carried through the Draft EIS analysis.
The Draft EIS considers six alternatives including the No Action
Alternative. Alternatives include in-water and land-based components
such as the wharf, access trestles, an abutment where the trestles
connect to the shore, extension of an existing paved road, construction
of a new upland gravel access road, and an upland construction staging
area. The wharf proper (excluding access trestles) would lie
approximately 600 feet offshore at water depths of 60 feet to 100 feet,
and would consist of a covered ordnance handling area, a warping wharf,
and lightning protection towers. A warping wharf is a long narrow wharf
extension used to position submarines prior to moving into the
operations area of the EHW-2.
The six alternatives considered in this Draft EIS are as follows:
(1) Alternative 1 (Combined Trestle, Large Pile Wharf)--access
trestles would be combined over shallow water to reduce impacts to
shallow-water habitat and resources. The wharf would be supported
primarily on large (up to 48-inch diameter) piles and smaller (24-inch
to 36-inch diameter) piles. Alternative 1 is the preferred alternative.
(2) Alternative 2 (Combined Trestle, Conventional Pile Wharf)--
access trestles would be combined as for Alternative 1 but would use a
conventional pile wharf supported on a larger number of smaller piles
(24-inch to 36-inch diameter). The dimensions of the conventional pile
wharf would be the same as the large pile wharf. Pile driving would
take longer than for Alternative 1.
(3) Alternative 3 (Separate Trestles, Large Pile Wharf)--access
trestles would be completely separate. There would be more trestle
piles and greater overwater area, including more area over shallow
water. The large pile wharf would be the same as for Alternative 1.
(4) Alternative 4 (Separate Trestles, Conventional Pile Wharf)--
access trestles would be separate as for Alternative 3 and would use a
[[Page 15304]]
conventional pile wharf as for Alternative 2.
(5) Alternative 5 (Combined Trestle, Floating Wharf)--access
trestles would be combined as for Alternatives 1 and 2. This
alternative would employ a floating wharf rather than a pile-supported
wharf. The wharf would be supported on large concrete pontoons and
connected to mooring dolphins. The floating wharf would be larger than
the pile-supported wharves and would entail considerably fewer piles
than Alternatives 1 through 4.
(6) No Action Alternative--there would be no construction or
operation of the EHW-2. The Navy would not have the required facilities
to perform routine operations and upgrades required to maintain the
current fleet of TRIDENT submarines at NBK Bangor through 2042, the
life of the current TRIDENT weapons systems. The No Action Alternative
is considered in accordance with Section 1502.14(d) of the NEPA
regulation.
The Draft EIS evaluates the potential environmental effects
associated with the construction and operation of the EHW-2 at NBK
Bangor, WA. Alternatives were evaluated within several environmental
resource areas including marine, upland, and social environments. These
resource areas include: hydrography (currents and tides), water
quality, sediment, underwater noise, marine vegetation, plankton,
benthic communities including shellfish, marine fish, marine mammals,
marine birds, threatened and endangered species, geology and soils,
surface water and groundwater, vegetation, wetlands, wildlife, noise,
air quality, cultural resources, American Indian traditional resources,
coastal and shoreline management, land use and recreation, aesthetics,
socioeconomics, utilities and energy, transportation, and public health
and safety. Methods to reduce or minimize impacts to affected resources
are addressed. The analysis includes an evaluation of the direct,
indirect, and cumulative impacts.
All action alternatives would have the same types of environmental
impacts; however, the magnitude of these impacts would vary among the
alternatives. The principal types of marine impacts during project
construction would include pile driving noise (and its effects on
marine biota) and turbidity. In the long term, impacts would include
loss and shading of marine habitat including eelgrass, macroalgae and
benthic community, and interference with the migration of juvenile
salmon, some species of which are protected under the Endangered
Species Act (ESA). All action alternatives would have the potential to
adversely affect fish and bird species protected under the ESA, and
marine mammals (behavioral disturbance) protected under the ESA and the
Marine Mammal Protection Act (MMPA). Injury is not expected to any
marine mammal or bird. Upland construction would result in permanent
and temporary impacts to forest, shrub lands, and wetlands; however,
most areas would be replanted following construction and mitigation
would offset the permanent loss of the wetland area. Wildlife would be
disturbed by construction noise, especially pile driving, but no
terrestrial animals or plants protected under the ESA, the Migratory
Bird Treaty Act, or Bald and Golden Eagle Protection Act would be
affected. Measures are proposed to mitigate these impacts. Recreational
and residential areas would be disturbed by pile driving noise.
Mitigation measures would be implemented to minimize impacts from pile
driving noise. Construction barges could affect marine traffic in Hood
Canal and would affect vehicle traffic on the Hood Canal Floating
Bridge. Mitigation measures would be implemented to minimize impacts
from marine construction traffic.
In accordance with Section 7 of the ESA, the Navy is consulting
with NMFS and the U.S. Fish and Wildlife Service for potential impacts
to Federally listed species. The Navy is also consulting with NMFS
regarding potential effects on Essential Fish Habitat under the
Magnuson Stevens Fishery Conservation and Management Act, and working
with NMFS to ensure compliance with the MMPA. The Navy will submit an
application to the USACE for a permit under Section 10 of the Rivers
and Harbors Act, and Section 404 of the Clean Water Act. Navy analysis
has indicated that under the Clean Air Act requirements, air pollutant
emissions would not exceed thresholds for a major source for any
alternative. Under all action alternatives, the setting of the EHW-1,
which is eligible for listing under the National Register of Historic
Places, would be adversely affected by the proposed action; however,
the Navy will consult with the State Historic Preservation Officer
(SHPO) and develop a mitigation plan. There would be a small potential
for disturbance of archaeological resources during construction; if any
such resources were encountered, the Navy would coordinate with the
SHPO and affected American Indian Tribes. Access to Tribal fishing
areas would not be affected by any alternative; however, implementation
of the proposed action would adversely affect fish, which are Tribal
treaty reserved resources. The Navy is conducting government-to-
government consultation with the potentially affected Tribes.
Mitigation is included as part of the proposed action to address the
impacts to these aquatic resources.
The decision to be made by the Navy is to determine which of the
alternatives analyzed in the EIS to implement, based upon reasonably
foreseeable environmental impacts and operational needs.
The Draft EIS was distributed to Federal, State, and local
agencies, elected officials, and other interested individuals and
organizations. The public comment period will end on May 2, 2011.
Copies of the Draft EIS are available for public review at the
following libraries:
1. Jefferson County Rural Library, 620 Cedar Avenue, Port Hadlock,
WA 98339;
2. Port Townsend Public Library, 1220 Lawrence Street, Port
Townsend, WA 98368;
3. Poulsbo Library, 700 Northeast Lincoln Road, Poulsbo, WA 98370;
4. Silverdale Library, 3450 NW Carlton Street, Silverdale, WA
98383;
5. Sylvan Way Library, 1301 Sylvan Way, Bremerton, WA 98310; and
6. Seattle Central Library, 1000 Fourth Avenue, Seattle, WA 98104.
The TRIDENT Support Facilities EHW-2 Draft EIS is also available
for electronic public viewing at: http://ehw.nbkeis.com. A paper copy
of the executive summary or a single compact disc of the Draft EIS will
be made available upon written request by contacting Naval Facilities
Engineering Command Northwest, Attention: Ms. Christine Stevenson, EHW-
2 EIS Project Manager, 1101 Tautog Circle, Silverdale, WA 98315-1101.
Federal, State, and local agencies, elected officials, and
interested individuals and organizations are invited to be present or
represented at the public hearings. Written comments can also be
submitted during the open house sessions preceding the public hearings.
Oral statements will be heard and transcribed by a court reporter;
however, to ensure the accuracy of the record it is encouraged that all
statements should also be submitted in writing. All statements, both
oral and written, will become part of the public record on the Draft
EIS and will be responded to in the Final EIS. Equal weight will be
given to both oral and written statements. In the interest of available
time, and to ensure all who wish to give an oral statement have the
opportunity to do so, each speaker's
[[Page 15305]]
comments will be limited to three (3) minutes. If a long statement is
to be presented, it should be summarized at the public hearing with the
full text submitted either in writing at the hearing or mailed to Naval
Facilities Engineering Command Northwest, Attention: Ms. Christine
Stevenson, EHW-2 EIS Project Manager, 1101 Tautog Circle, Silverdale,
WA 98315-1101. Comments may also be submitted online at http://
ehw.nbkeis.com/ during the comment period. All written comments must be
postmarked by May 2, 2011, to ensure they become part of the official
record. All comments will be addressed in the Final EIS.
Dated: 14 March 2011.
D.J. Werner,
Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy,
Federal Register Liaison Officer.
[FR Doc. 2011-6518 Filed 3-18-11; 8:45 am]
BILLING CODE 3810-FF-P
|